0

The back door of my church has a stair landing above it that is supported by two 4x4 posts. One of the posts is in the path of the door and people are always running into it. I want to move this post over 12 inches to create a clear walkway. The structure above is simply an enclosed stair landing (4' x 5') that attaches to the newer second story. (Picture a 50"x48" rectangle sticking out from the building.) It is made as follows: On the 50" stair side: 2- 2x12x58 beams that sit on the 8" block header of the first story and a 4x4 post on a concrete slab. The other 50" side is 2- 2x12x50 beams that do not attach to the building side but rest on a 4x4 post on a concrete slab. The 48" side next to the building is 1- 2x12x48 attached to the wood frame of the second story. The problem side is 1- 2x12x48 and 1- 2x12x40 that are nailed into the 50" sides and bracketed to the 4x4 posts. My thought is to bolt a 2x8x66 to the existing outside 2x12x48 with 1/2" lag bolts every 8" and bracket it to the top of a new 4x4. I would also attach a hanger bracket to the building side that is currently NOT supported. Then I would cut off the existing 4x4 that is in the way of the door. Does this sound like it would work?

1
  • 2
    A simple photo would have saved you a whole lot of typing and us a whole lot of eyebrow furrowing. :)
    – isherwood
    Commented Jan 24, 2017 at 0:19

1 Answer 1

1

In a commercial building, you have a duty of care to your clients.

The only place to get this kind of advice is from an accredited source, such as a professional engineer or architect.

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service and acknowledge you have read our privacy policy.

Not the answer you're looking for? Browse other questions tagged or ask your own question.