I recently had to repair a very small area (roughly a 2 ft wide x 1 ft rectangle) of my basement concrete floor after a water pipe repair. This area will have carpet installed over the concrete. The rest of the floor is completely dry and in good condition.
What is a minimum wait time I should wait before beginning pad and carpet installation?