I need to install a handrail on a set of interior stairs. I also need to be able to remove the handrail and balusters so that furniture can be taken up those stairs because of limited clearance. how can i attach the handrail and balusters to the upper and lower newel posts so that they are removable?

It looks similar to this except the knee wall meets the ceiling at the upper end:

knee wall

3
  • What kind of material does it need to be made from? Wood? Metal? etc.
    – Chris
    Commented Jul 7, 2012 at 22:48
  • I want to use wood
    – bib
    Commented Jul 8, 2012 at 2:22
  • 1
    I just did this for my basement stairs. I'll take some pics tonight and then post an answer.
    – mohlsen
    Commented Jul 11, 2012 at 13:17

2 Answers 2

5

After consultation with my master-carpenter-looking-over-my-shoulder, Dan, the following solution was arrived at:

railing

1.The newel post - built up from 1x3 clear oak boards glued together. Two are full length, one is beveled (before gluing) to sit on top of angled knee wall. Attached by two lag bolts at base and one lag bolt into handrail.

newel

2.Base - shoerail molding (with trough cut out to hold balusters)

shoebase

runs up the angled knee wall. The shoerail is cut into two sections directly below the spot where the handrail meets the ceiling. This will allow the railing to be separated into an upper section, bounded by the base and top rail, and a lower section, bounded by the base and handrail. It is attached with 1 screw in the middle of the upper section between two balusters. The lower section is attached with two screws, also inserted between balusters.

shoebase

3.Top - shoerail is also used at the top in the same manner as the base. Two screws hold the top shoerail to the ceiling (screwed directly into studs at the ceiling/stairwell edge).

top molding

4.Handrail - Standard handrail (with trough) held in place at newel by one lag bolt and at ceiling by one long screw upward into stud.

handrail

5.Balusters - These are toenailed into base shoerail and top shoerail. For extra strength, blausters are glued before nailing (Nailholes will be covered by fillet pieces).

6.Fillets - these are the filler strips put into the shoerail moldings top and bottom to lock in the balusters. They are nailed into place after the balusters are inserted in the shoerial. The fillet peices that sit over the attachment screws, top and bottom, are not nailed in, but held by small recessed screws so that the can be taken out.

fillet

All nailing was done with an 18 gauge nailgun.

Removal involves

a) unbolting the newel post,

b) removing the newel post,

c)removing the fillet pieces covering the screw holes in the base and top shoerails,

d) removing the two screws holding the lower shoerail base in place,

e) removing the upper handrail screw at the ceiling,

f) removing the lower handrail/base/baluster assembly,

g) removing the two screws holding the top rail,

h) removing the screw holding the upper section of the base rail,

i) removing the upper top/base/bauster assembly.

1

If you google "removable handrail" there are a lot of results. This video shows one that is pretty straight forward Basically you make it as a contained unit mounted on a lower board and then attach that lower board to the existing floor. To remove it, you just take up the screws and it's good to go.

2
  • Thanks, but my issue is the open side of the stairs themselves. The area above the 45 degree angled kneewall that covers the edges of the risers is the section that needs to be removable
    – bib
    Commented Jul 24, 2012 at 18:26
  • could you add some pictures, either of your set up or a similar one?
    – Zach
    Commented Jul 24, 2012 at 19:20

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service and acknowledge you have read our privacy policy.

Not the answer you're looking for? Browse other questions tagged or ask your own question.