I would like to move this toilet to the wall on the left side of the picture:
The bathroom is in a flat with two flats above, so the soil pipe is actively used by these other flats. Here is the current plumbing:
In order to move the toilet I would like to move the waste pipe so it is plumbed into this side of the soil down pipe:
Would this be possible, to add plumb a new toilet waste pipe into this side with minimum disruption? If so how would you recommend achieving this?