I recently purchased the lot next door in Lincoln County, Oregon. I’d like to build a shop now and someday build another house or let one of my kids do it.
Can I have a 4/0 service wire run from the transformer to a 400 amp single phase meter base on a pedestal at the front of the lot, come out of the meter base and split the service in 3 way boots in a pe20?
From there, I'd run 1/0 or 2/0 to a 200amp panel at the shop and when the day comes run from the pe20 to a 200amp panel at the future house. Can I also do this?