This is a follow-up question to this post: How would you grade this patio?
What if instead of running a 1/32" per foot along the red lines (East to West) for the full run, I leveled off after 10 feet or so? The pitch along the blue lines (North to South) would stay as suggested for the full patio (1/8" per foot).
I've included a picture where the purple section would have "two directional" pitch (net pitch of NE to SW), and a cyan section where the pitch would only follow the Blue lines (North to South).
Are there any potential issues with this approach? Thanks in advance.