I live in Ohio and embarking on finishing my basement. I am planning to put R-10 rigid foam boards between my poured concrete walls and the stud walls. I only have about 2 feet or less of the foundation wall above grade. Does anyone have experience with a similar basement that was only insulated to R-10? Would it be sufficient given that the exterior of the foundation is insulated and below grade?
There is so much conflicting information and conjecture that I haven’t been able to figure out if I really need to put batt insulation in the stud walls on top of the foam board or not.
For example. Currently only the above grade parts of the walls have foam board insulation. I work down there currently and while it is a bit chilly, a hoodie and socks and I’m comfortable. I’m wondering if the additional foam board with walled out rooms and a good flooring would be enough to make it comfortable without the added layer of a hoodie.