1

The power and neutral go to all the smart switches. The master must be at the box which has the branch to the light. I am not at all sure that the Leviton supports multiple remotes. But if it does, you'll need to allocate all the /3 wires as follows: Black = always-hot White = neutral Red = Yellow/Red data line


Only top voted, non community-wiki answers of a minimum length are eligible