Skip to main content
3 of 3
added 5 characters in body; added 14 characters in body
Tester101
  • 132.4k
  • 79
  • 324
  • 612

Neutral and ground should only be bonded at the service equipment. This could be at the service drop, the meter, or the service disconnect (250.24(A)(1)).

Looks like the neutral is bonded in your main panel, via the bonding screw.

enter image description here

The second panel is then fed using four wires, to keep ground and neutral separate.

enter image description here

Tester101
  • 132.4k
  • 79
  • 324
  • 612