I'm attempting to lay some laminate flooring over a level floor made of screed.
At the edges of the floor where it meets the wall I can see that under the screed it looks like the builder has already put down a damp proof membrane (DPM).
So if theres a DPM under the screed do I still need to put another layer of DPM over the screed before laying underlay and a new laminate floor?