So I am finishing my basement and the side I'm finishing has an extra 4" pour on it as well as old 8x8 asbestos tile. My plan is to carpet over it. Do I need a vapor barrier? I get that concrete is porous but the tile on the 8" (4" on top of the original 4") leads me to believe that there already is a vapor barrier on the floor.
Thanks, Joe