One of the drywall I need to hang runs parallel to the joists (concrete joists and slab above it), and I'm at lost on how to affix the upper tracks which would be between two joists.
I've seen this problem address with wooden joists and studs, but it is kind of different problem when using steel studs and concrete joists.