You will have better surface to screw/nail bottom plate working on original concrete as is. You can and should always level before getting floor done.

0

It doesn't matter unless it is really far off. Also leveling isn't a must do.

0

I'd do the floor first. You'll have an easier time with the wall and you won't have to try to level against wooden studs.