Simple question: when installing a custom made door jamb, should it be sitting directly on top of the subfloor or be lifted up a little (like drywall is lifted 1/2", for example)?

2

You can leave it a little off if you want = about 1/4"... You will be cutting the bottoms when install flooring. If you do carpet a 1/4" is about perfect.

  • for hardwood or tile I like it cut flush with the finished floor surface. – HerrBag Jun 12 '13 at 11:50