I'm about to start tiling the shower for the master bath, and I wanted to make sure we used the proper transitions from tile to the drywall.
I guess I have two questions.. is there anything I need to do with the current gaps between the shower board and dry wall before tiling for the flat wall and corner transitions? And then what kind of trim piece would be best for each?
The shower tiles are 12"x24," so I'm not sure about tiling around the corner there. Just want to make sure this is finished right. Thanks!