I have steep slope in my backyard and I hired a contractor company to build a 4 feet average retaining wall for me so that slope can be leveled. They are almost done and now are saying there will be 1-1/2" of slope from back of foundation to behind the wall. He mentioned its required for drainage.
Do you really need that much for just 15 feet built flat area from back of house to behind the wall?