I have a Residential building(India) which has no space in both front and back yard. It's a newly built two storey building( 3 houses ). There is 5 feet space available parallel to building wall.
As the sand is clay , I couldn't do soakway to drain the sewage water hence I'm planning to dig three 2.5 ft width cement well ring for 10 feet depth and 5 feet distance from each well and 1.5 feet from building wall. so sewage water from each house will go it's individual cement ring well.
I really feel this can solve my sewage water issue.
But I'm really worried whether it could affect my building as soil underneath can loosen.
Please give me suggestions
FYI: Click here to read building tilt accident
Basically a borewell nearby the building has weakened the foundation of the building and has caused building to tilt.