I want two remove two walls on the second floor a-frame that run perpendicular to the roofline. Some things I've noted:
- The sliding door when closed blocks the middle point / ridgeline
- The floor joists in the room run parallel to the wall, however the floor joists switch to perpendicular to the wall once it gets about a foot from the wall (ie. joists are perpendicular where the wall sits)
Thanks for any tips!
Edit: Update: Started pulling down the sliding door frame and drywall and unfortunately came across a beefy header above the door frame. Looks like this wall is load bearing and would need an engineer to redesign it if I want to proceed.