I’ve built a small workshop and I’m beginning to workout where I want the receptacles and where I want switches and lighting. Is there anything wrong with pulling wire up close to the ceiling instead of down low? And also bring 90% of the wiring distribution in through the top of the panel?
The building is stand-alone 14x34‘ and I have multiple doors and windows to pull wires over. Almost all of my receptacles will be at 53” from the floor. It just doesn’t make sense to me during the rough in drilling holes to run wire over a doorway then down and back up over the next doorway.