I just had a composite covered deck installed with wood railings. Part will be screened and rest open. The contractor is ready to frame for screened portion and advised me to stain before he frames.
I'm using Cabot Australian Oil. Instructions state avg. min temp should be 50 for 48 hrs before applying. The avg. temp now is 34 & I've already sanded rails, rafters, & steps. It wont warm up for another 2 months to the 50 degree requirement.
How long can I wait without resanding for stain? Or will I need to resand? What do I do?