I don't know if this is the correct stack, since it isn't in a home, but I think it still fits.
I have a electronics assembly company, and we run two assembly lines. They consist of several machines, with the heaviest being around 4000lbs, on 6 metal casters. We currently have the line on a concrete slab, inside a large converted warehouse.
The concrete slab is badly spalled, and apparently didn't have a vapor barrier when originally poured. If we leave anything heavy on the floor (cardboard box), it will be dripping with water the next day. We maintain a humidity level of 45%, which probably brings more water up also. We are located in Florida, so have a high water table.
The landlord is willing to work with us to fix this issue, and a contractor recommended we do a vapor barrier on the slab, then a grid of 2x4's, then tongue and groove plywood. On the plywood we would install ESD safe vinyl tiles. They said this is common in gyms and dance studio's. They use rubber strips under the 2x4's to help dampen noise and vibration.
It's hard to find information on this method, is this suitable for this amount of weight, in an industrial environment? I really don't see of many other options if this isn't acceptable to do. I would assume we would do the 2x4's either 6" or 12" on center.