I am pouring 11 steps down the side of my home to a basement entrance. The home side is 8 inches of poured concrete the other is 8 x 8 x 16 blocks i just laid. i have the stairs formed and have wire mesh and 1/2 rebar in them.

I am wondering for each step, should drill a hole in the house wall and in the block wall then put a rebar from side to side in both holes. Drill one hole a little deeper to push in the rebar so it fits between the wall and block then pull it into the block wall. the rebar would have equal lengths into each wall.

i was thinking this would keep the steps from moving/floating between the walls.

your thoughts?...

  • I would probably add rebar a little extra support can't hurt, if using a block on 1 side I would want the center of the blocks to be filled. Since the stairs will be sandwiched the rebar won't have to be very deep in the wall / block but o would want it closer to a foot or more on the step. – Ed Beal Jul 11 '18 at 18:30

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service, privacy policy and cookie policy

Browse other questions tagged or ask your own question.