I've been using my shower with just dry wall up for months now (don't ask :) Anyway, there's a little bit of mold, I'm guessing, on a small section of the wall. I'm finally ready to put up some tile.
Do I need to replace the dry wall since I've been abusing it with the shower before I put up new tile. Can't I just let it dry or spray something on it?