My first tile job has not gone according to plan. This was my previous post on preparing the underlayment for the small mosaic tile.
I pulled up the OSB and replaced, re-secured the subfloor, replaced the tar paper, installed 1/4" underlayment and 1/4" CMB.
The problem (one of them anyway) was that using the thinset to join the different CMB cuts cause the floor to be be about 1/8-1/4" un-level the length of the floor. This is very noticeable when walking on it.
Here's a few photos of the installation (be kind!).
What would be the fastest way to address this rather than taking up the entire floor again (possibly buying more tile depending on salvage) and applying self-leveling cement? I'm really worried about the transition if I add any more height to the floor as it's just even the way it is now.
Is it possible to bring up just the most affected areas and apply a thicker cost of thinset? Or, is that just begging for different problems?