I have a 100amp subpanel in my garage that I wired with several high-capacity appliances, such as 50amp welder, 20amp compressor, 20amp AC, 30amp car charger, 30amp car lift, plus 3 15amp circuits for generic 110v outlets. As long as I am aware that I shouldn't charge my car, run the AC, and weld at the same time, am I okay with this setup?
When it passed inspection my electrician mentioned off-hand that he was a little worried about load calcs, and he was glad it passed. If the main breaker trips at 100amp, why was he worried?