At my request a few years ago an electrician pulled a 30amp 2 pole breaker out of the panel and replaced it with two single pole 15 amp breakers and connected them to the existing 10/3 cable.
10/3 runs from the two 15amp breakers to a jbox. Is it still code (NEC) to construct two separate 15 amp circuits from the jbox in this scenario? if so any suggestions for labeling the jbox?
Thanks.