Some structural guys bopped the back of a bathroom shower wall while installing some beams on the other side. A few subway tiles in a corner cracked in an area that get's a lot of moisture. Although I got a discount for the oops, it's been a while since I thought about this problem so there might be some moisture that has gotten in there already.
My question: if I have extra tile and grout for replacement, would ripping just these four tile (or maybe also the adjacent) out and replacing be a recommended thing to do, or would we have to replace all of the shower tub tile? I'm concerned about the corner placement, but maybe I shouldn't be (in the pic don't mind the blur on the tub, that was my quick and dirty photoshop fix to get rid of a hairball, only the four tile are affected)
Thanks for any feedback or suggestions