I am going to get a new shed but first I need the base. I have purchased a plastic grid base system, I have measured out the area and have cleared the turf on top.
Now, I am coming a bit stuck on the best way to ensure that the ground is level before I start constructing.
I have heard of laying gravel down and raking, but this is extra cost and I would like to attempt levelling the Earth base first.
At the moment I just have a pointed spade and a spirit level that is too short :-)
The issue I see is that the ground is a bit lumpy in places so will need to perhaps take from some the lumpy bits to place in the lower bits, but how can I know the places to take from to ensure a proper base?