I'm sheathing a garage with 14ft walls and with a panel of zip at 80$ I want to make sure I'm making efficient use of materials. On each wall there is a 2' cutoff if two 8' panels are use like ways vertical. How can I incorporate that 2' into the layout so I don't have to buy a ton more sheets. Any code references on minimum sheathing width? Blocking required al all seams?
I do have fire block at 10' and shear block at 8'. Is it code legal to go 8' then a 2' piece and finish with a 4' piece or is the answer stacking 4', 4', 4', 2' the right answer?