Main bldg with 200a service. Detached 10x10 welding shed 40' away. Ran #6 (hot, hot, neutral, and #8 ground) in conduit from main bldg to shed for 60a service. Will have 60a breaker in main bldg panel feeding a 12 circuit sub panel with 60a main breaker for disconnect since we have more than 6 circuits. Will have #6 bare copper ground to two 8' ground rod outside bldg. Installed grounding bar in Panel and is not bonded.
Inside welding shed will have two 220v circuits using 6/3 on 50a breakers. Remaining 6 circuits are 12/2 for 110v lighting and outlets. (two 20a GFCI circuits, one dedicated 20a non-GFCI for small AC window unit, one dedicated 20a 120v for welder, one dedicated 15a for LED inside lighting, and one dedicated 20a for outside GFCI outlet.
This is not a commercial welding setup and only ONE of the three welders will ever be used at any given time.
Am I on the right track?
Any input is appreciated.
Best Regards, Richard