Skip to main content
2 events
when toggle format what by license comment
Jul 20, 2016 at 21:29 comment added user2446 Those are actually 4x's out of the concrete with the occasional 4x6. So I shouldn't need to worry about weakening the posts by attaching a (treated) band joist with lag bolts, or the added load on those posts? Note that the joists cannot rest on the concrete - the level of the floor will be about 1' above the concrete.
Jul 20, 2016 at 21:05 history answered D Webb CC BY-SA 3.0