Timeline for How to frame a floor in an unfinished crawl space?
Current License: CC BY-SA 3.0
2 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Jul 20, 2016 at 21:29 | comment | added | user2446 | Those are actually 4x's out of the concrete with the occasional 4x6. So I shouldn't need to worry about weakening the posts by attaching a (treated) band joist with lag bolts, or the added load on those posts? Note that the joists cannot rest on the concrete - the level of the floor will be about 1' above the concrete. | |
Jul 20, 2016 at 21:05 | history | answered | D Webb | CC BY-SA 3.0 |