Feb 25, 2015 at 3:52 comment added Tester101 @ThreePhaseEel Nothing, it would have been compliant if it existed. NEC 2011 introduced requirements for a grounded (neutral) conductor at switch locations, which depending on the installation may require an additional conductor
Feb 25, 2015 at 3:38 comment added ThreePhaseEel What prevents 14/4 from complying with earlier electrical codes?
Feb 24, 2015 at 20:44 vote accept the_meter413
Feb 24, 2015 at 20:03 history edited Tester101 CC BY-SA 3.0
added 103 characters in body
Feb 24, 2015 at 19:52 history edited Tester101 CC BY-SA 3.0
added 364 characters in body
Feb 24, 2015 at 19:44 history answered Tester101 CC BY-SA 3.0