Feb 25, 2015 at 3:52 | comment | added | Tester101 | @ThreePhaseEel Nothing, it would have been compliant if it existed. NEC 2011 introduced requirements for a grounded (neutral) conductor at switch locations, which depending on the installation may require an additional conductor | |
Feb 25, 2015 at 3:38 | comment | added | ThreePhaseEel | What prevents 14/4 from complying with earlier electrical codes? | |