New construction home. Meter base is on front outside of garage. Service panel at rear wall. Can I run 2-2-4 individual wires from the meter base to the panel?

I'veNew construction home. Meter base is on front outside of garage. Service panel at rear wall. I've already run 2-2-4 SER from my meter base to my sub/main panel. The meter base has a main service breaker. New construction in California.

The 2-2-4 I have run is not in a single sheath, but 3 individual wires. I've been told that California requires it be sheathed as one or run in conduit. My questions are: is this correct, and if not, is there anything I can wrap the wires with that will satisfy California code?

New construction home. Meter base is on front outside of garage. Service panel at rear wall. Can I run 2-2-4 individual wires?

I've already run 2-2-4 SER from my meter base to my sub/main panel. The meter base has a main service breaker. New construction in California.

The 2-2-4 I have run is not in a single sheath, but 3 individual wires. I've been told that California requires it be sheathed as one or run in conduit. My questions are: is this correct, and if not, is there anything I can wrap the wires with that will satisfy California code?

Can I run 2-2-4 individual wires from the meter base to the panel?

New construction home. Meter base is on front outside of garage. Service panel at rear wall. I've already run 2-2-4 SER from my meter base to my sub/main panel. The meter base has a main service breaker. New construction in California.

The 2-2-4 I have run is not in a single sheath, but 3 individual wires. I've been told that California requires it be sheathed as one or run in conduit. My questions are: is this correct, and if not, is there anything I can wrap the wires with that will satisfy California code?

edited tags
Link
nobody
  • 7.1k
  • 3
  • 34
  • 42
punctuation, grammar
Source Link
Huesmann
  • 5.1k
  • 12
  • 26

I've already run 2-2-4 serSER from my meterbasemeter base to my sub/main panel. The meter base has a main service breaker. New construction in California.

My question is; theThe 2-2-4 I have run ,isis not in a single sheath, but 3 individual wires. I've been told that California requires it be sheathed as one or ranrun in conduit. IsMy questions are: is this correct, and if so not,is is there anything I can wrap the wires with that will satisfy California code?

I've already run 2-2-4 ser from my meterbase to my sub/main panel. The meter base has a main service breaker. New construction in California.

My question is; the 2-2-4 I have run ,is not in a single sheath, but 3 individual wires. I've been told that California requires it be sheathed as one or ran in conduit. Is this correct and if so ,is there anything I can wrap the wires with that will satisfy California code?

I've already run 2-2-4 SER from my meter base to my sub/main panel. The meter base has a main service breaker. New construction in California.

The 2-2-4 I have run is not in a single sheath, but 3 individual wires. I've been told that California requires it be sheathed as one or run in conduit. My questions are: is this correct, and if not, is there anything I can wrap the wires with that will satisfy California code?

added 4 characters in body
Source Link
Solar Mike
  • 28.7k
  • 2
  • 33
  • 66