Timeline for Disconnect breaker upgrade 125A -> 200A
Current License: CC BY-SA 4.0
11 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Aug 9, 2023 at 15:25 | comment | added | Luke Catania | Dominion Energy is the service provider. | |
Aug 3, 2023 at 1:59 | answer | added | ThreePhaseEel | timeline score: 2 | |
Aug 3, 2023 at 1:58 | comment | added | ThreePhaseEel | @LukeCatania -- who do you have for an electric utility btw? | |
Aug 2, 2023 at 19:07 | comment | added | Luke Catania | Meter Stack Side Label - imgur.com/BSZ3owJ Meter Stack Top Label - imgur.com/KtUeUKb Terminal Box Label - imgur.com/abC94hI | |
Aug 2, 2023 at 6:15 | history | edited | Luke Catania | CC BY-SA 4.0 |
Spelling
|
Aug 1, 2023 at 2:59 | comment | added | ThreePhaseEel | Can you get us photos of the label on the inside bottom left of the customer compartment you opened up please? (Also, I sincerely hope you didn't break any utility seals in the process of getting those photos) | |
Jul 31, 2023 at 17:17 | history | edited | Luke Catania | CC BY-SA 4.0 |
Added links to pictures and added tags
|
Jul 29, 2023 at 21:14 | comment | added | Harper - Reinstate Monica | Don't reduce picture resolution. Do a "Save as..." and pick "JPEG" and then reduce the "Q"uality slider (1-12) to 3. Vastly smaller file size, and we can still see detail. | |
Jul 29, 2023 at 4:50 | comment | added | ThreePhaseEel | Post the photos to imgur and post a link here, we can help you get them attached | |
S Jul 29, 2023 at 4:02 | review | First questions | |||
Jul 29, 2023 at 4:10 | |||||
S Jul 29, 2023 at 4:02 | history | asked | Luke Catania | CC BY-SA 4.0 |