Skip to main content
3 events
when toggle format what by license comment
Jul 22, 2023 at 15:18 comment added keshlam @MTA: In particular, I've been told that passing it through spray foam adhered to the building does count. (Instructions for wiring through insulation panels where studs aren't available to staple to.)
Jul 22, 2023 at 13:47 comment added MTA The point that divB needs to grasp is that code does not require a staple, it requires any fastening means that is UL listed for the purpose.
Jul 22, 2023 at 12:57 history answered Ecnerwal CC BY-SA 4.0