Correct gap size to around 20mm (not 35 - 35mm)
Source Link

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with between 25 and 35mmabout a 20mm gap with some gaps as high as 35mm. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong.

The grout is intended to be flush with bricks and high strength. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Current paving to be matched: Existing Pavers

Pavers recently laid yet to be grouted. enter image description here

Thanks.

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with between 25 and 35mm gap. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong.

The grout is intended to be flush with bricks and high strength. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Current paving to be matched: Existing Pavers

Pavers recently laid yet to be grouted. enter image description here

Thanks.

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with about a 20mm gap with some gaps as high as 35mm. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong.

The grout is intended to be flush with bricks and high strength. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Current paving to be matched: Existing Pavers

Pavers recently laid yet to be grouted. enter image description here

Thanks.

Add pictures and clarify.
Source Link

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with between 25 and 35mm gap. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong.

The grout is intended to be flush with bricks and high strength. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Current paving to be matched: Existing Pavers

Pavers recently laid yet to be grouted. enter image description here

Thanks.

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with between 25 and 35mm gap. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Thanks.

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with between 25 and 35mm gap. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong.

The grout is intended to be flush with bricks and high strength. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Current paving to be matched: Existing Pavers

Pavers recently laid yet to be grouted. enter image description here

Thanks.

Source Link

Brick pavers with 25 - 35mm gaps - Any Issue?

Our landscaper has just finished laying about 35sqm of brick pavers. On inspection I noticed the majority are spaced with between 25 and 35mm gap. Our driveway (which the current work is supposed to match) has spacing of 10mm +/- 5mm. Landscaper says the grout will be 1 part cement / 2 parts sand so the final surface will be very strong. But I'm a little concerned because I've never seen bricks laid so far apart before and everywhere I look the recommendation is for much smaller gaps.

Should I make them pull up the pavers and relay them. They've glued them to a sand cement bedding, so it will be a lot of work.

Thanks.