Jan 4, 2022 at 17:45 | vote | accept | user101289 | ||
Dec 11, 2021 at 18:36 | comment | added | Harper - Reinstate Monica | That's tricky @user101280. There's actually no such thing as 60A wire. I doubt it is 55A wire since those are rarely seen in conduit, so I expect it's 65A wire, which requires #8Cu or #6AL ground. Copper can be bare. | |
Dec 10, 2021 at 17:27 | comment | added | user101289 | do you happen to know what size conductor I'd need to pull back to the main panel for a ground on a two-pole 60A service to the subpanel? Thanks | |
Dec 10, 2021 at 15:42 | comment | added | user101289 | Thanks, that makes a lot of sense | |
Dec 10, 2021 at 7:52 | history | answered | Harper - Reinstate Monica | CC BY-SA 4.0 |