Jan 15, 2021 at 14:33 | comment | added | Ecnerwal | Clarifying point 2: the whole point of a junction box is that it has a cover, which is removable, which you remove when pulling cable, so you absolutely CAN take a left at Albuquerque. Unless you are a rabbit and want to run a cable to Pismo beach, then it never works out. | |
Jan 15, 2021 at 14:06 | comment | added | Ecnerwal | 1: you can't use 3 10 port switches for 30 connections, because you have to connect the switches to each other, which eats 4 ports from your 30. 2: it's called a junction box. We use them. 3: When a junction box is not needed, it's called a pull point (LB, LR, LL, etc.) - access for pulling. 4: Takes a HUGE house to exceed 100 meters on a run; the house described is not huge. 5: Since you'll have "the old tech" in place, you simply run the two side by side until you want everythng on "the new tech" and you're not limited by arbitrary "floor" layout. | |
Jan 15, 2021 at 13:50 | history | answered | FreeMan | CC BY-SA 4.0 |