I have two existing concrete footers from the previous bridge that are not leveled. I thought about using hydraulic cement to level the top of it. The left side needs to be about 2 inches higher than what it currently is, while the right side can remain the same.

The existing footers are 9 by 47 inches. The are about 3 feet deep into the ground and edge of the creek. The bridge will be made of wood. I used 3 2x12 10 ft long as arched trusses. I will be using 1x6 deck boards as the walking platform and they will be 4 feet long. Mainly foot traffic and a push mower. I just need to level the footers so when I anchor the bridge to it it doesn’t look like crap. I thought about shims but with the left side being 2 inches too low it would look like crap as well. My question is would you use self leveling cement to level the footers or do you suggest a different route?

I’ll add a photo of the footers when I get home from work.

enter image description here

enter image description here

I have two existing concrete footers from the previous bridge that are not leveled. I thought about using hydraulic cement to level the top of it. The left side needs to be about 2 inches higher than what it currently is, while the right side can remain the same.

The existing footers are 9 by 47 inches. The are about 3 feet deep into the ground and edge of the creek. The bridge will be made of wood. I used 3 2x12 10 ft long as arched trusses. I will be using 1x6 deck boards as the walking platform and they will be 4 feet long. Mainly foot traffic and a push mower. I just need to level the footers so when I anchor the bridge to it it doesn’t look like crap. I thought about shims but with the left side being 2 inches too low it would look like crap as well. My question is would you use self leveling cement to level the footers or do you suggest a different route?

I’ll add a photo of the footers when I get home from work.

enter image description here

I have two existing concrete footers from the previous bridge that are not leveled. I thought about using hydraulic cement to level the top of it. The left side needs to be about 2 inches higher than what it currently is, while the right side can remain the same.

The existing footers are 9 by 47 inches. The are about 3 feet deep into the ground and edge of the creek. The bridge will be made of wood. I used 3 2x12 10 ft long as arched trusses. I will be using 1x6 deck boards as the walking platform and they will be 4 feet long. Mainly foot traffic and a push mower. I just need to level the footers so when I anchor the bridge to it it doesn’t look like crap. I thought about shims but with the left side being 2 inches too low it would look like crap as well. My question is would you use self leveling cement to level the footers or do you suggest a different route?

I’ll add a photo of the footers when I get home from work.

enter image description here

enter image description here

added 4 characters in body
Source Link
isherwood
  • 148.8k
  • 8
  • 179
  • 439

I have two existing concrete footers from the previous bridge that are not leveled. I thought about using hydraulic cement to level the top of it. The left side needs to be about 2 inches higher than what it currently is, while the right side can remain the same.

The existing footers are 9 by 47 inches. The are about 3 feet deep into the ground and edge of the creek. The bridge will be made of wood. I used 3 2x12 10 ft long as arched trusses. I will be using 1x6 deck boards as the walking platform and they will be 4 footfeet long. Mainly foot traffic and a push mower. I just need to level the footers so when I anchor the bridge to it it doesn’t look like crap. I thought about shims but with the left side being 2 inches too low it would look like crap as well. My question is would you use self leveling cement to level the footers or do you suggest a different route? I’ll

I’ll add a photo of the footers when I get home from work.   

enter image description here

I have two existing concrete footers from the previous bridge that are not leveled. I thought about using hydraulic cement to level the top of it. The left side needs to be about 2 inches higher than what it currently is, while the right side can remain the same.

The existing footers are 9 by 47 inches. The are about 3 feet deep into the ground and edge of the creek. The bridge will be made of wood. I used 3 2x12 10 ft long as arched trusses. I will be using 1x6 deck boards as the walking platform and they will be 4 foot long. Mainly foot traffic and a push mower. I just need to level the footers so when I anchor the bridge to it it doesn’t look like crap. I thought about shims but with the left side being 2 inches too low it would look like crap as well. My question is would you use self leveling cement to level the footers or do you suggest a different route? I’ll add a photo of the footers when I get home from work.  enter image description here

I have two existing concrete footers from the previous bridge that are not leveled. I thought about using hydraulic cement to level the top of it. The left side needs to be about 2 inches higher than what it currently is, while the right side can remain the same.

The existing footers are 9 by 47 inches. The are about 3 feet deep into the ground and edge of the creek. The bridge will be made of wood. I used 3 2x12 10 ft long as arched trusses. I will be using 1x6 deck boards as the walking platform and they will be 4 feet long. Mainly foot traffic and a push mower. I just need to level the footers so when I anchor the bridge to it it doesn’t look like crap. I thought about shims but with the left side being 2 inches too low it would look like crap as well. My question is would you use self leveling cement to level the footers or do you suggest a different route?

I’ll add a photo of the footers when I get home from work. 

enter image description here

edited title
Link
isherwood
  • 148.8k
  • 8
  • 179
  • 439

Concrete footer for 10 foot How can I raise a concrete bridge footing two inches?