Timeline for Can I use Schedule 40 PVC to protect a grounding electrode conductor where exposed to physical damage?
Current License: CC BY-SA 3.0
2 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Aug 15, 2017 at 13:38 | comment | added | Tester101 | Inspectors in your area might allow schedule 40 for protection, but as per code and UL listings, only schedule 80 is good for protection from physical damage. | |
Aug 14, 2017 at 19:09 | history | answered | Retired Master Electrician | CC BY-SA 3.0 |