3
votes
1answer
100 views

It is reasonable to expect a contractor to replace the last foot of HVAC duct work, the connection between the insulated duct and the register?

The contract was to replace an antiquated HVAC and duct work. Since the registers are a standard size, would this connection also be a standard pre-fabricated part? What is that last connection ...