Sign up ×
Home Improvement Stack Exchange is a question and answer site for contractors and serious DIYers. It's 100% free, no registration required.

I'm building a non-structural wall in my basement. I'm using Pressure-treated lumber on top of a foam sill gasket to protect from any moisture. How many tapcons should be used per 8-foot length to ensure long lasting stability?

share|improve this question
Not sure but some folks say 42 is the answer to everything. –  Michael Karas Feb 4 at 14:37
I enjoy the humor but I'm looking for a helpful answer ;) –  Randyaa Feb 4 at 14:40
Have you considered using a powder actuated tool, to drive fasteners into the floor. You can pick up a cheap 0.22 caliber single shot Ramset for ~$25.00. Load the nail, load the charge, place the tool, give it a whack with the hammer, done. –  Tester101 Feb 4 at 16:23
I considered it and ultimately decided on the Tapcons. –  Randyaa Feb 4 at 16:28
You must like drilling holes in concrete. –  Tester101 Feb 4 at 16:33

5 Answers 5

up vote 7 down vote accepted

I'd use 3 good ones in an 8 foot run; more if they don't feel solid. (Since it's not structural, all you're really trying to do is hold the wall to the floor and resist any after-the-fact warp/twist issues.)

share|improve this answer
This is about what I thought was reasonable but I was worried about shear strength. Is 3 appropriate to secure the wall with occasional lateral force? This will be living space and there are children. –  Randyaa Feb 4 at 16:30
@Randyaa: Will the children be driving tractors in the room? Will the be using a wrecking ball? If not, then three fasteners are plenty. –  wallyk Feb 4 at 19:52
Thanks for the help. 3 seems to be the way to go and my worries were unfounded. –  Randyaa Feb 4 at 20:15
It's all about how they feel going in. If I didn't like it, it gets another one right next to it. –  Mazura Feb 5 at 2:28

If you've prebuilt the wall, one per stud bay will provide sufficient clamping. (6 total for 16inch stud spacing)

If you are stick-building in place , I like two at each end (staggered by an inch and countersunk). Then 3 more at 2 ft intervals. (7 total for 16inch stud spacing)

I use the 1/4 inch vs the 3/16 version for more strength. The 3 1/2 x 1/4 are good for this task.

share|improve this answer
Always use 1/4", 3/16 strip or snap half the time. –  Mazura Feb 5 at 2:21

I'm doing something similar, except I'm using powder-actuated charges to push a nail in instead of a Tapcon scheme.

Same situation in the basement, too... non-load-bearing regular partition walls, with kids running around and all that.

See my earlier question here: Is there a recommended distance between fasteners on sole plates?

In short, I'm using 3 fasteners, though that looks to be more than what's necessary.

share|improve this answer

My rule of thumb is one at each end, and then every other stud. Every other stud may be overkill, but it's easier to overdue it a little than under do it and have to repair the job later. Structural fasteners around the top and bottom plates tends to be done as close to a stud as possible, to leave lots of room for utilities that are being drilled through. You won't have this on your concrete floor, but it doesn't hurt to stay close to the stud (but not so close that you can't fit your drill in).

share|improve this answer

The sill or bottom plate you are securing to the concrete will likely not take any impact itself, but will have to accept impacts from studs attached to it.

This question shows a typical 2x4 can expect to hold well over 300 pounds of evenly distributed force over a 6 foot span with no issues. It will handle sudden impacts of significantly greater magnitude before failing. So you can expect the wood to be fine with only 3 positions along it secured to the floor.

A 3/16 tapcon, embedded in normal concrete one inch deep has a sheer strength of over 700 pounds.

So as far as "long lasting stability" three tapcons per 8 foot length is probably still overkill.

You might want to secure it more frequently for purposes of vibration/noise reduction, or if your concrete is suspect, but beyond that you're wasting fasteners, drill bits, and time.

share|improve this answer