I am redoing a bedroom and I am in the process of installing a new sub floor. I currently have 1x6 running perpendicular to the floor joists. Some do have a bit of give to them. I am laying over that 3/4" Tongue and Groove plywood.

I was wondering if I need to run the grain of the plywood perpendicular to the floor joists or do I run it perpendicular to the 1x6 boards I am laying on top of.

Also Do I need to screw down the 1x6's prior to laying the plywood, Or will the 3.5" deck screws do the trick when I am laying the plywood?

Thank you for the help.

share|improve this question
    
I really don't understand why you are adding a new sub floor over 1x6. Seems to me the 1x6 is the sub floor. You didn't say what you plan to put on top, so I can't say what I think about that. –  getterdun Feb 23 at 16:44

2 Answers 2

I would reset all the nails that are holding the 1X6s,making sure the nail point has found new wood by setting the nail head below the surface by making the last few strikes with the hammer at an angle to dimple the wood with the nail head. With the nails drawn tight, that should eliminate any potential floor squeaks, but for redundancy add a screw between all the nails. Do not add no more than that, the potential of splitting the joist tops. So if you can, run the screws in at an angle to get the screw to not go the same direction as the other nails. It is a minor detail, but that is what I would do.

After your existing subfloor is secured do what you can to get your T&G joints to break near the center of the 1X6, running you plywood the same direction as the 1X6, perpendicular to the joists.

In my opinion, 3/4" along with the existing 1X6, is overkill on the subfloor/underlayment combination, unless you are setting tile. 5/8" T&G will be a lot easier to carry upstairs and still give a T&G feature which is good. In a minimalistic approach 1/2" underlayment grade plywood will work very well too with the re-secured 1X6. DO make sure it breaks on the center of the 1X6s, cut it if it is not, I refer to NON T&G plywood here so ripping an inch or two off the occasional piece does not matter. What matters is it breaks on the 1X6 everywhere. After that 1 1/4' OR 1 5/8" screws on a 8" grid pattern and construction adhesive will tie it all together. There is no need for 3 1/2" screws for any reason. Maybe 2 1/2" in the joists here and there if you choose, but remember the thing mentioned about too many fasteners in the tops of the joists.

share|improve this answer

First if you have thinner boards for subfloor, the next layer should perpendicular. It doesn't matter which way the joists are going, when talking about 2 layers up. The decks screws seem a little long too. If you are hitting the joists I don't understand it.

Personally 1x6s are fine for a subfloor. If I had to do this I would glue and screw the subfloors together.

share|improve this answer