I'm about to begin setting all of my terminal posts for a chain link fence. However, upon digging the post hole for the terminal post that goes up against the house, I ran into a possible problem. After digging about 12 inches down, I ran into concrete ( I assume this is from the garage's foundation and perhaps the basement as well), and it runs away from the house for about 11 inches. That means between the terminal post and the house would be an eleven inch gap. The fence is intended to keep the dogs inside, and that gap would be too much of a problem.

The fence fabric is 48" in height, and the post is 72". The terminal post needs to be 50" above ground with the remaining 22" buried. Do any of you have any suggestions on how to approach this situation?

share|improve this question
add comment

2 Answers

up vote 2 down vote accepted

I had the same situation at my place, I set the post and ran the top rail past it to the house and set elbows to make a hoop to carry the chain link past the post. I did not want to screw anything to the house so I rebent wall brackets to clamp the top and bottom rails to the line postDog pen

share|improve this answer
    
Hmm, that is one solution. Although, I suppose that means you used a line post and not a terminal post there, correct? –  thtsigma Nov 19 '13 at 4:13
    
Yes I did, it only has to support the weight of the fence, which is pretty light, no need for the heavy weight post, at least for me it was, there is no way anything can push on it hard enough to bend it, and it is set in concrete. –  Jack Nov 20 '13 at 3:46
add comment

One way to do it would be to cut terminal post off by the extra 10 inches, setting it in concrete on top of the footing concrete, and attaching the post to the house with 180 degree chain link brace bands. Or, you could nail a 2x6 to the house and attach the brace bands to it.

Alternately, you could put the terminal post at the edge of the footing concrete, pull your wire taut to there, then add another post up against the house. The wire to this post would not be carrying any tension, so you could set it at 12 inches, cutting off the excess.

share|improve this answer
add comment

Your Answer

 
discard

By posting your answer, you agree to the privacy policy and terms of service.

Not the answer you're looking for? Browse other questions tagged or ask your own question.