I bought some treated 2x4's from Lowes, and it was fairly wet and heavy. I went ahead and built a firewood rack, but screwing into it releases a lot of water. It got me thinking, is it better to let the wood dry out a while before building with it?
This project is done, but if I was going to use treated wood in the future, should I buy some ahead of time and let is sit outside for a few weeks?