I have overhead wire providing my two phase electric service. The line from the pole appears to be relatively new and the splice connectors appear to be in good condition as well.
However, there is little to no slack to provide a drip loop and the two conductor wires appear to be rubbing against each other. Even worse it seems, the cable jackets all seem to be cracking and splitting after the splices (but before the meter).
Who is responsible for this section of the drop? The property owner or the utility company?
Obviously this needs immediate attention and I appreciate your help on this in advance!